Progress as at 25/06/2011
40 days after it was first started the construction now is almost 50% complete. The latest progress, the roof was already fully constructed. With the roof installed only now the real looks of the house emerges... Well, it looks fine... at least to my eyes.
|
Tuan tanah kedaung doing her routine site visit... hehehe |
We changed the design of the verandah's roof a little bit. Originally we planned to build a cement slab on top as roof. But Edi advised us to build a 'conventional' roof as it would add a sense of traditional touch and looks to the house. Especially with the
limas style of roof. We glad that we followed the advice, other than looks much better it also helps the house appeared to stand out instead of its small built up. On the third pic above, the
limas roof is also present on the back roof.
Next they will start the wiring works as the inside walls are all completed. Then only they will plaster the walls. Here are some of the inside pics.
|
Verandah |
|
Dining and kitchen |
|
Living |
|
Bathroom and the back door |
Will update again soon...
rumah sape ni long???
BalasPadamKira ni second house le ni... kat kg Ulie kat Melaka.
BalasPadamrenting rate camne charge ni? haha..ingat nak rasmi kira 1st checker in..
BalasPadamOrg first tak yah bayar. Tapi masa chk in bawak la satu dua perabot sekali. Masa chk out perabot kena tinggal... hahaha
BalasPadam