Progress as at 08/06/2011
The bricks walls are all completed except for the plastering works. They are now constructing the upper concrete beam of the whole building. The following pictures show the progess of the construction works done so far and also the comparison with the drawings.
Picture 1
From inside facing front door |
Picture 2
Store room at the back of the house |
Picture 3
From right, notice that the window on the right already relocated at the centre of the wall. |
From the front. |