Building A Small House - 4th Update





Progress as at 08/06/2011

The bricks walls are all completed except for the plastering works. They are now constructing the upper concrete beam of the whole building. The following pictures show the progess of the construction works done so far and also the comparison with the drawings.

Picture 1
From inside facing front door



Picture 2
Store room at the back of the house


Picture 3
From right, notice that the window on the right already
relocated at the centre of the wall.



Picture 4
From the front. 



Looking at the last camera photo above, you can see two foundations on the ground without any pillar yet to build. That is where the floor of the verandah will stretched-out.

Will update again soon...